TitleProduct

OEM Plastic Car Bumper Injection Molding Mold

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2020-01-09 16:49

  • Browse the number:

    325

Send an inquiries

Company Profile

Zhejiang Kaihao Plastic Mold Co., Ltd

By certification [File Integrity]

Contact:kaihao(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.kaihaomold.com/ http://kaihao.fect-q.com/

Product Details


OEM Plastic Car Bumper Injection Molding Mold &plastic auto front bumper parts injection mould China maker 

Product Descriptions:

Mould Name:

OEM Plastic Car Bumper Injection Molding Mold

Mould Core steel:

S45C, S50C, P20, 2738, S55C, 718H, 618H, S136, 2316, NAK80, etc.

Mould Cavity steel:

S45C, S50C, P20, 2738, S55C, 718H, 618H, S136, 2316, NAK80, etc.

Mould base:

C45#, S50#,LKM etc.

Cavity:

Single or Multi

Runner:

Cold or Hot

Hot Runner:

YUDO, SYNVENTIVE ect.

Mould life:

300, 000 to 1, 000, 000 shots

Plastic Material:

PP, PC, PS, PE, PU, PVC, ABS, PMMA, ect.

Payment Terms:

T/T or L/C

Specification :

According to customer's requirements.

Design&program soft wares:

CAD/CAM/CAE, UG, PRO/E, Cimatron, Powermill, Solid works, Catia, etc.

Machines:

CNC, EDM, Mitutoyo, Haitian plastic injection machines, etc.

Package:

Wooden case

Transportation:

By Air or By Sea

Export Country:

Worldwide


KAIHAO Mold has been following prevention-oriented philosophy when starts every new project. Special Review Team consists of Engineering department, Manufacturing department, Project Department, Quality Control Department and Purchasing Department adopts mold flow analysis, similar projects experience summary and potential problems of customers requirements precaution, thereby to ensure the product quality.



Process Steps:

1.R&D

We support customer R&D .Make the files or improve the design if you needed

2.Negotiation

The quality ,price, material, cavity,delivery time, payment item ,ect.

3.Place an order

According your own design or you chooses our design.

4.Mould

According to customers' request to build the mould. Before make the mould, we sent mould design to customer approval first , before move forward to production ,we send samples to customer to confirm first.

5.Sample shoot

If the first sample come out is not satisfied customer, we modify the mould and until meet customers'satisfactory.

6.Products in store

If your quantity is beyond of our storage, we will provide lead time to you.

7.Delivery

Delivery goods by sea or by air, according customer’s requirement.


Qualification Controlling by KAIHAO MOLD:


Packaging & Shipping:

KaiHao mold factory mold tooling packing and delivery:

 

Tooling Protecting oil>>Standard wooden box>>Plastic film

 Mould tooling normally takes 35~40 days by sea. 3~7 days by air

 

KaiHao mold factory plastic products packing and delivery:


Packing: Each packed in bubble bag or Polybag, then packed into master carton.

Normally by air: 3~7 days 


1)Customer shall provide tool specification as well as part picture or drawing (In STP, X-T) for quotation.

2)KaiHao will quote within 24-48 hours.

1)Quality Control in each mold manufacturing process. 

2)Mold Inspection: each mold should be disassembled and inspected before shipment. 

1)Tool Makers strictly follow up

2)Project Managers make preventative plan, manage and report maufacturing status.


http://www.kaihaomold.com/